+351 214 866 440 geral@timelink.pt
Data Transfer module (DT)

Data Transfer module (DT)

“It serves to pass the proposal from the subcontractor to the CCS MC, (…). This pass is done in seconds, spending just a few more minutes to analyze the data, so we can import the comparative map to the CCS. “

Data Transfer Module (DT)

“From my experience, a proposed electrical installation can take up to 1 hour to be introduced in comparative maps. This time is reduced to a few minutes with the DT module. This systemized method also reduces the likelihood of incorrect pricing. “

Data Transfer Module (DT)

Data Transfer Module (DT)

“As for me this module is the” crown jewel “, it comes to save the time that the budget does not have. After 2 budgets executed with the loading of subcontractors through this module, I can only say one word, spectacular. “

Módulo Bill Consolidation (BC)

“This wasted time would be multiplied by the number of revisions to MQTs. With the BC module, the time reduction is significant “

Data Transfer module (DT)

Módulo Bill Consolidation (BC)

“Compile a Quantities Map, from the Owner of Works, in several excel sheets in a single file already with the external link to the CCS, in seconds, only needing a few minutes of preparation of the file, while without the tool Would take significantly longer. “